SafeStop brochure
Review the existing product brochure with your maintenance and purchasing teams.
Download brochure ↓Confirm current specifications and availability with us before ordering.
Resources for housing teams
Product information, installation planning, and a practical checklist for dryer-spacing reviews across your developments.
Review the existing product brochure with your maintenance and purchasing teams.
Download brochure ↓Confirm current specifications and availability with us before ordering.
Compare wall mounting and magnetic mounting, and check the dryer and wall surfaces before your crew begins.
Review installation guidance →Use the checklist below during unit turnovers and planned maintenance visits.
View the checklist →Video resources
Review SafeStop installation and dryer-hose positioning with your maintenance and purchasing teams.
Before installation
SafeStop is designed to maintain a six-inch gap using two brackets per dryer. Verify that the proposed layout meets the appliance manufacturer's installation instructions.
This is planning guidance, not a substitute for the product's installation instructions or a complete dryer and vent inspection.
Confirm a suitable mounting location and wall structure. Select fasteners appropriate for the surface and follow the product instructions.
Confirm that the dryer back is compatible with the supplied magnets and that the brackets can be positioned securely without obstructing connections or service access.
For turnovers and routine visits
Record the unit or work-order reference in your own maintenance system. Schedule follow-up for conditions your team cannot resolve during the visit.
Send your estimated dryer count, locations, and purchasing requirements.